U5
Revision as of 12:46, 13 June 2022 by Tina Curtis (talk | contribs)
Built 1955, rebuilt by TGR in 1960. Worked on the Derwent Valley Line and West Coast.
Locomotive U5 Timeline
1951 | Built by Malcolm Moore Industries, Victoria for Utah Constructions - Malcolm Moore Model 10-102 fitted with a Gardner 6LW engine and Wilson-Drewry transmission. |
1951 - 1954 | Engaged on construction work on the S.E.C. (Vic.) Kiewa Hydro-electric Power Scheme |
April 1954 | Stored surplus at Footscray, Vic. |
July 1959 | Bought by the T.G.R. & shipped to Tas. |
Mid - late 1959 | Rebuilt to 3'6" gauge and new cab and running boards fitted at Launceston Workshops. |
8/4/1960 | Entered service allocated to Smithton. |
1974 > 1981 | Stored out of use (but available for service) in Smithton. |
Mid 1981 | Stored out of service in Smithton. |
29/9/1981 | Written off. |
June 1982 | Sold to TTMS member, Ted Lidster. |
Late August 1982 | Railed (on KKC wagon) to Hobart. |
28/1/1984 | Towed TGR Vulcan Foundry 4-8-2 steam locomotive H2 from Hobart to new Tas. Loco. Co. Depot at Cadburys. |
16/12/1989 | Last loco to use Cadbury's warehouse siding. |
17/12/1993 | Transfer run of T.L.Co. rolling stock from Cadburys to DVR New Norfolk. Final rail vehicle to traverse the Cadburys Branch. |
20/8/2002 | Transported to Strahan for trackwork trains on West Coast Wilderness (Abt) Railway. |
5/9/2002 | Returned to DVR New Norfolk, having worked between Strahan and Dubbil Barril. |
Late 2002 | Track maintenance trains worked as far as Westerway. |
January 2011 | Out of service for running gear overhaul. |
2020 | DVR relaunch recommissioned |